SPENCE / SALINAS VALLEY, Monterey County — October 31, 2026. Spence Road appears in the county's planning pipeline for a substantial pavement rehabilitation. Monterey County's draft five-year Capital Improvement Program for fiscal 2026–27 through 2030–31 identifies project PW 2024-07, Spence Road Rehabilitation, with a combined estimated cost of $5,150,500.
What section is proposed for work?
The draft Monterey County CIP, project PW 2024-07, describes rehabilitating the county-maintained roadway between U.S. Highway 101 and Old Stage Road near Chualar. It identifies possible pavement recycling and/or new hot-mix asphalt to extend the road's useful life. The budget breakdown assigns $650,000 to design and environmental review, $700,000 to construction management, and $3,800,500 to construction, for a combined $5,150,500.
Is construction already scheduled?
No. The draft lists the project phase as Not Started and describes beginning engineering or design in fiscal 2026–27. Proposed funding would involve a combination of SB 1 transportation funds and Measure X. A draft project allocation does not establish that a construction contractor has been hired, work has begun or the entire amount has been appropriated in final adopted form.
What should drivers and growers watch?
Spence Road is used by agricultural operators, regional traffic and employees traveling between U.S. 101 and Old Stage Road. Residents should ask the county to clarify future detours, truck access, project limits and the actual design schedule when it approves a final capital list. The county road-advisory page gives better information about live roadwork than a long-range budget.
Primary source: Monterey County draft FY2026–27–2030–31 Capital Improvement Program, PW 2024-07. This is proposed future work, not confirmed active road construction.
Support Spence News
Choose how to support Spence News:
Credit / Debit Card via StripeChoose your contribution amount on the secure California58 Stripe checkout. One-time support for independent local journalism.
Continue with PayPal Continue with ZelleZelle payments go to Vitaly Ataev Troshin. Please verify the recipient in your bank before sending. Availability depends on your bank.
Optional reader support. When possible, add “Spence News” to the payment note. Contributions are not advertised as tax-deductible. Support does not influence editorial decisions.More from Spence News
- Old Stage and Spence Road Turn-Lane Requirement Appears in County Development Permits →
- Farmers Requested 'Share the Road' Signs From Spence Road Toward Gonzales; Committee Supported the Plan →
- Monterey County Maintains 1.93 Miles of Spence Road From Highway 101 to Alisal Road, Inventory Says →
- Spence's 1,800-Foot Vegetated Ditch Shows How Farm Runoff Can Be Treated Before It Reaches Quail Creek →
СООБЩЕСТВО
Комментарии
Присоединяйтесь к обсуждению California58. Чтобы комментировать, необходимо войти в аккаунт.
Создайте бесплатный аккаунт California58 или войдите через доступную социальную сеть.